https://twitter.com/search?q=kiwifarms&src=typed_query
twittertards debate whether or not locksneed fartin or kiwifarms is worse. massive sneedfest
- 53
- 70
Top Poster of the Day:
J
Current Registered Users: 25,579
BROWSE EFFORTPOSTS SITE GUIDE DIRECTORY Emojis & Art | Info Megathreads HOLES PING GROUPSCURRENT EVENTS:
Find Rightoid Drama
500 mbux per post, no limit/h/kappa Monthly Tournament
fighting vidya - Soku 12.3 | 10k+ prize pool | April 27thDrama: any incident, scene, gaffe, rumor, opinion, or disagreement that is blown entirely out of proportion.
Do your part to keep our community healthy by blowing everything out of proportion and making literally everything as dramatic as possible.
Rules:
- Asking to see who saved comments/posts=1 day ban
- You must be 18 or older to view this site.
- NO RIGHTWING AGENDAPOSTING.
- Discord users will be banned on sight.
- Don't post anything illegal.
- No sexualizing minors, even as a joke. This includes cartoons.
- No doxxing.
- Using alts to game dramacoin will get you banned.
- Supporting free speech is an immediate ban.
- Absolutely NO anti-CCP sentiment.
- Absolutely NO homophobia, transphobia or furphobia.
- Absolutely NO misgendering.
- Absolutely NO antisemitism.
- Absolutely NO vaccine misinformation.
- You are encouraged to post drama you are involved in.
- You are encouraged to brigade in bad faith.
- You are encouraged to gaslight, to gatekeep, above all else, to girlboss.
- Participation implies enthusiastic consent to being mod abused by unstable alcoholic bullies.
Related subreddits:
πππ«π© π°π¨π³ ππ«π
Live commit: 603300f
Jump in the discussion.
No email address required.
Wrote a big ling thing up about Lockheed, probably would have dox'd myself. Short version:
They suck, they engineer shit, lose the sustainment contract as soon as the first one expires.
They're just too big and have separated themselves from operations.
Pretty easy for the government to come forward with requirements and some LM engineers can meet those requirements.
The problem is the r-slurs from the government putting out the requirements and the LM engineers designing the system have no operational experience.
If the design doesn't take it's operation into mind then the sustainment program is fricked from jump street and that's why they lose contracts.
I make a frickton of money because I understand this and after 25 years can roll with the punches and not get jaded about it.
I have taken millions from Lockheed-Martin on a grudge because their bullshit automated resume screener denied me and the program manager that was gonna steal me didn't answer his email for 4 days. There's a longer story there, but they lost. Frick them and GD.
Jump in the discussion.
No email address required.
More options
Context