Windows 3.11: Bahn sucht Administrator für 30 Jahre altes Betriebssystem
Deutsche Bahn (DB) has a "new" job opening for a Windows 3.11 Admin.
The lucky candidate should also be able to manage MS-DOS and Windows Workgroups.
Windows 3.11: Bahn sucht Administrator für 30 Jahre altes Betriebssystem
Deutsche Bahn (DB) has a "new" job opening for a Windows 3.11 Admin.
The lucky candidate should also be able to manage MS-DOS and Windows Workgroups.
Jump in the discussion.
No email address required.
Jump in the discussion.
No email address required.
I'm betting that they define capacity in some 1970s way that's designed to excuse every failure in 2024 to improve or be reliable. I bet these people think a McDonalds runs at "350% capacity" because they're efficient with the equipment, process, and management.
Modern train control can run more trains more closely spaced. Rail lines don't have a fixed "capacity" any more than copper and fiber optics have fixed capacities (excluding extreme theoretical ones we can't reach yet).
Jump in the discussion.
No email address required.
Wrong. A solid line of trains from one end to the other of the rail, would be at capacity.
Jump in the discussion.
No email address required.
actually hold on, this may be something. Make a loop around the country, just one big train. It stops every minute to let people off/on somewhere, but only goes one way. There is no train to miss, because it's ...
the...
ALLTRAIN
Jump in the discussion.
No email address required.
More options
Context
Capacity is a rate. A solid line of trains from one end to the other moving at almost light speed would be the max theoretical capacity.
Jump in the discussion.
No email address required.
right, that's what I was about to say. You didn't let me finish my thought.
Jump in the discussion.
No email address required.
More options
Context
More options
Context
More options
Context
More options
Context
More options
Context